New Construction Inspection

Independent pre-drywall, final and 11-month warranty inspections that catch builder mistakes while they are still visible, and are still the builder’s responsibility.

Pre-drywall, final and 11-month inspections that catch builder mistakes.

Builder partnerships icon: house with a teal hard hat outline

Three moments that matter

Three key moments

Swipe to compare →

1

Pre-Drywall

before insulation and drywall
Before insulation

Framing, rough plumbing and electrical, penetrations, flashing and everything else that is about to disappear behind finishes. 

Framing, rough plumbing, electrical and flashing, before it’s all covered.

Framing, rough plumbing and wiring exposed before insulation and drywall
2

Final

Before closing and final walkthrough
Before closing

Systems operation, visible installation defects, fit and finish, and a punch list your builder can work from rather than argue with.

Systems, defects and finish, plus a punch list for your builder.

A completed new-construction home before closing
3

11-Month

Around month 10 or 11 of ownership
Around month 10 or 11

Settling, cracking, leaks, HVAC and comfort problems, and the warranty items.  Booked before the warranty expires.

Settling, cracks, leaks and HVAC, before the warranty ends.

InterNACHI Certified 11th Month Warranty Inspections badge

Inspection Plans: One phase, or the whole build.

Most owners start at pre-drywall and add the final. The three-phase plan is the one that still protects you eleven months after you move in.

Swipe to compare →

Core service

Single Phase

Pre-Drywall, Final or 11-Month
$395

Any one phase, booked on its own.

Most popular

Build Protection

Pre-Drywall + Final
$740

Saves $50 against $790 booked separately.

Save $50 vs. separate booking.

Complete build protection

All Three Phases

Pre-Drywall + Final + 11-Month
$1,085

Saves $100 against $1,185 booked separately.

Save $100 vs. separate booking.

Scheduling a build

Construction dates move. We would rather know your drywall and closing targets early and adjust than have you call the week the insulation goes in.

If you book a pre-drywall or final inspection, we can remind you before the next phase comes due, including the 11-month warranty deadline.

Dates move. Share your drywall and closing targets early, and we’ll remind you before each phase, including the 11-month deadline.

Have these ready

Independent Oversight

A code inspection is not the same thing.

Code is a minimum

Municipal inspections check code compliance and public-safety requirements. That is their job, and it is a floor, not a workmanship review.

We work for you

An independent inspection focuses on property condition and workmanship and gives you a documented punch list. We are on your side of the transaction.

A short build season

Northern Michigan compresses trades and sequencing into a narrow window. Schedule pressure is exactly when sequencing errors happen.

One full winter matters

A full heating season, freeze-thaw cycles, and actual occupancy can surface conditions no closing walkthrough could have shown. That is what month eleven is for.

A full heating season, freeze-thaw cycles and real occupancy reveal what no closing walkthrough can.

Frequently asked questions.

After rough-in is complete and inspected, but before insulation and drywall go up. That is usually a window of a few days, so tell us your estimated drywall date as early as you can and we will work backwards from it.

Most do, and reputable builders are used to it. Raise it early rather than the week of, and give us the site contact so access can be arranged without friction. If a builder refuses outright, that is worth knowing too.

Systems operation, visible installation defects, fit and finish, and everything that belongs on a punch list before you close. It is a full inspection, delivered in a form your builder can act on.

Most builder warranties run twelve months. Settling, cracking, leaks and HVAC problems tend to show up after a full heating season, which means they appear late in that year. Inspecting around month ten or eleven leaves time to file warranty claims before the coverage closes.

After rough-in is complete and inspected, but before insulation and drywall go up. That is usually a window of a few days, so tell us your estimated drywall date as early as you can and we will work backwards from it.

Most do, and reputable builders are used to it. Raise it early rather than the week of, and give us the site contact so access can be arranged without friction. If a builder refuses outright, that is worth knowing too.

Systems operation, visible installation defects, fit and finish, and everything that belongs on a punch list before you close. It is a full inspection, delivered in a form your builder can act on.

Most builder warranties run twelve months. Settling, cracking, leaks and HVAC problems tend to show up after a full heating season, which means they appear late in that year. Inspecting around month ten or eleven leaves time to file warranty claims before the coverage closes.

Yes. Each phase stands on its own at $395. Most owners start with pre-drywall or final and add the others once they see the report.

A new house is not automatically a low-radon house, so radon testing is worth it. On municipal sewer, a scope catches construction damage to the new line. On a well and septic build, testing establishes the baseline you will measure against for years.

No. Municipal inspections verify code compliance. Ours is scoped to your interests as the owner, covering workmanship and condition, and produces a punch list rather than a pass or fail.

Yes. Each phase stands on its own at $395. Most owners start with pre-drywall or final and add the others once they see the report.

A new house is not automatically a low-radon house, so radon testing is worth it. On municipal sewer, a scope catches construction damage to the new line. On a well and septic build, testing establishes the baseline you will measure against for years.

No. Municipal inspections verify code compliance. Ours is scoped to your interests as the owner, covering workmanship and condition, and produces a punch list rather than a pass or fail.

Don't wait until the warranty is over.

Choose the construction phase you are in now, or book the full inspection plan so the next milestone is already covered.

$395 per phaseBook My Phase
Scroll to Top